2009 Washington, NC Waterfront Promenade and Marina

Washington, NC Waterfront Promenade and Marina

Washington, NC Waterfront Promenade and Marina

CSE constructed this marina for the town of Washington, North Carolina on the Pamlico River. It is constructed and operational, with:

  • 48 wet slips 35 to 80 feet
  • 2000 linear foot rehabilitated bulkhead and waterfront promenade
  • wastewater disposal systems
  • marine power systems
  • fixed timber docks
  • ferry landing dock

This marina was constructed in a Flood Hazard Area.